All roles

Open role

[Remote] Mechanical Commissioning Engineer (Data Center Construction Experience)

Remote · Nigeria Full-time

Note: The job is a remote job and is open to candidates in USA. InPwr, Inc. is an award-winning electrical design-build firm headquartered in Indianapolis, IN, seeking a seasoned Mechanical Commissioning Engineer to join their dynamic team. The role involves overseeing the installation, testing, and verification of mechanical systems and equipment to ensure they function correctly and meet design specifications before operation.

Responsibilities

  • Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed
  • Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections
  • Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality
  • Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency
  • Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams
  • Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining
  • Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed
  • Finally, they compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization
  • Travel required to different sites. 75% of travel required
  • Perform a Daily report on site
  • Be professional in all aspects
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing
  • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others
  • Mechanical team lead on site
  • Responsible for expense reports and following company policies
  • Oversees the QA/QC and commissioning on their area of work
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS
  • Strong Organizational and documentational

Skills

  • Bachelor of Science of Mechanical Engineering
  • HVAC, CRAC, AHU, ACCU, others
  • OSHA 10
  • Complete all Safety Certifications
  • Script development for L2-L5
  • Daily Reports
  • Knowledge of CAD, Bluebeam, and others
  • Ability to work directly on site, and ability to travel required 75%
  • Strong foundation in mechanical engineering principles (BSME)
  • Practical experience with electrical systems and equipment
  • Excellent problem-solving skills
  • Attention to detail
  • Ability to work effectively in multidisciplinary teams
  • Travel required to different sites. 75% of travel required
  • Perform a Daily report on site
  • Be professional in all aspects
  • Communicate professional to the GC, EC, and Owner
  • Oversees meetings, schedules, and testing
  • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others
  • Mechanical team lead on site
  • Responsible for expense reports and following company policies
  • Oversees the QA/QC and commissioning on their area of work
  • Able to create the Final Building report in conjunction with ECx, MCx and FLS
  • Strong Organizational and documentational skills
  • Job Requires working in all elements, depending on job location, time of year
  • Must be able to utilize construction site sanitary facilities
  • Work in restricted areas
  • Wear personal protective equipment (hard hat, safety glasses always), respirator when required
  • Able to work 8-10 hours per day, 40-50 hours per week

Benefits

  • Medical, Dental, Vision and Life Insurance 100% company paid for employees
  • Paid vacation & holidays
  • 401(k) company match
  • 30-day paid sabbatical every 5 years of employment
  • Stable employment with a growing company
  • Highly competitive salary

Company Overview

  • An award-winning design / build electrical contracting firm. It was founded in 2005, and is headquartered in Indianapolis, Indiana, USA, with a workforce of 201-500 employees. Its website is https://inpwrinc.com/.
  • More open positions

    [Remote] Sr. Social Media Manager

    Work from home Full-time role

    [Remote] Business Development Manager

    Work from home Full-time role

    [Remote] Business Development Manager

    Work from home Full-time role

    [Remote] Strategic Account Executive 8

    Work from home Full-time role

    [Remote] Performance Media Analyst (Remote)

    Work from home Full-time role

    Key Account Manager | Indianapolis

    Work from home Full-time role

    Chaplain (PART-TIME) Bryan, TX - *Bilingual Spanish Preferred*

    Work from home Full-time role

    Senior IT Leader

    Work from home Full-time role

    [Remote] DevOps / Release Engineer (Microsoft Fabric & Azure DevOps) - REMOTE

    Work from home Full-time role

    Project Manager, Evidence Synthesis and Decision Modelling

    Work from home Full-time role

    Experienced Customer Service Representative – Sales Support and Account Management

    Work from home Full-time role

    Utilization Management Nurse Consultant

    Work from home Full-time role

    Global Monitoring + Insights Temp - Weekend Shift - US Remote

    Work from home Full-time role

    (Full stack) Java/react Developer

    Work from home Full-time role

    Sterling OMS Developer

    Work from home Full-time role

    Green Belt - Business Process Consultant

    Work from home Full-time role

    Opinion Writer (Remote / Entry Level)

    Work from home Full-time role

    Remote Cost Accounting Manager

    Work from home Full-time role

    Finance AI Trainer & Reviewer (Remote, Flexible Hours)

    Work from home Full-time role

    Fraud Analyst III - Fraud Operations

    Work from home Full-time role

    Salesforce Administrator

    Work from home Full-time role